In addition to being involved in the construction of the car factory’s buildings, our company also performed the organization of the area’s infrastructural development and Construction supervision. A nearly 7,7 km-long waste water drainage system, and a rain water drainage system of 35 km in total length were implemented on an area of nearly 158 ha. Road works were also coordinated by our company: high-capacity and conventional asphalt covering, concrete and paving surface, plastic lawn grid roads and gravel roads were built on an area of 227,000 m². In addition, a 1,8 km-long speed- and test track was built and a 7,5 km-long industry rail track was created. Gardening works cover an area of about 300,000 m².
Similar projects
2011
158 ha
Construction management
Construction supervision
Health and safety supervision