Dunapack steam boiler centre

Four alternative, natural gas and light fuel oil-fired steam-boiler backups were created to supply the steam consumers of the Dunapack paper mill of Dunaújváros. ÓBUDA Group carried out architecture and integrated design of the hall housing the boilers and the connected infrastructure.

Similar projects

Liget infrastructure

Budapest

MTK Football Stadium

Budapest

Bácsalmás water pipe

Bácsalmás
Client
Hamburger Hungária Kft.

Project info
Dunaújváros, Hungary
2009
2 000 m²

Services
Architecture and integrated design