BUD: Office Center

The construction plans of the offices were made by the Óbuda Építész Stúdió and the BREEAM assessment tasks were carried out by Óbuda-Újlak Zrt. As part of the project, the original building was completely rebuilt by replacing the whole facade, the electrical and mechanical systems. Thanks to the new lightweight structure envelope the investment reached a high environmental performance in material use. The office centre received the BREEAM Very Good Interim certificate in the designing phase, and it was the first in Hungary to be able to get the final Very Good certificate.

Similar projects

Bácsalmás water pipe

Bácsalmás

Szentendre town centre

Szentendre

MTK Football Stadium

Budapest
Client
Budapest Airport Zrt.

Project info
Budapest, Hungary
2013
10 000 m²

Services
Architecture and integrated design
BREEAM assessment