SkyCourt, Liszt Ferenc International Airport (BUD)

As the partner of the CONSULGAL – Consultores de Engenharia e Gestão, S.A., within the framework of the FIDIC contract, we provided Construction supervision for the construction section during the expansion and renovation of Terminal 2 of the Liszt Ferenc Airport. Our tasks included reviewing, approval and improvement of the design plans transferred continuously as well as inspecting the materials to be built in, in terms of technical adequacy and their consistency to the plan. The specialty of the task was to be able to organise the construction and the inspection in a way that the airport could operate continuously and smoothly during these operations all the time.

Similar projects

Mercedes extension

Kecskemét

Takata airbag plant

Miskolc

Audi motor plant

Győr
Client
Budapest Airport Zrt.

Project info
Budapest, Hungary
2011
40 000 m²

Services
Construction supervision